| 2012 Projects ¤ Basin Bulkhead repair ¤ Dredging ¤ New Basin Docks |
| Task is behind: | Task is Working: | Task is Complete: |
| BASIN BULKHEAD REPAIR top more photos | |||
| Approval
|
Permits
|
Contracts
|
Bulkhead |
|
Jan 27 Electrical Lines |
Jan 25 |
| Status: |
| DREDGING top more photos | |||
| Approval
|
Permits
|
Contracts
|
Dredging |
| Status: |
| NEW BASIN DOCKS top more photos basin upper basin | |||||
| Approval
|
Permits
|
Contracts
|
Fabrication | Installation | Wiring, Cable and Water |
|
Jan24 |
Jan 24 |
| Status: Jan 25 |
All Manufacturing drawings are complete. All materials have been ordered. Specific components for the weldments are complete. Truss weldments are in fabrication. Gangways/Ramps are 75% complete. Power Pedestals have been ordered. |